Data centre
9,800 m² of load-bearing ceiling system installed
Steel installation, reinforcement, walkways, technical ceilings, finishing, alterations and snagging.
NL Trade delivers building work packages for data centres, from foundations and concrete structures to the building envelope, fit-out and snagging. When the programme comes under pressure, we mobilise a multi-skilled team to recover delays and release work areas to the following trades.

9,800 m²
load-bearing ceiling system installed in a data centre
68,000 m²
ceiling installations in a single project
92
installers on one site at peak
FROM FOUNDATIONS TO SNAGGING
multi-skilled construction capacity
NL Trade Oy is a building works contractor and flexible workforce partner for data centre projects. We deliver individual work stages, larger building work packages and rapidly mobilised works on a time-charge basis when a project needs additional skilled people.
Our strength is broad construction expertise. The same teams can work across foundations, concrete, reinforcement, structural steel, roofing, facades, partitions, technical ceilings, walkways, fit-out and final snagging as the project progresses.
Data centre programmes are demanding, with closely linked work stages. A delay in one building work package can quickly affect subsequent electrical, ICT, cooling, ventilation and other technical installations.
NL Trade teams can be deployed quickly to the work stage under the greatest programme pressure. Our aim is to remove the construction bottleneck, recover the delay and allow the following contractors to resume work to programme.
NL Trade can join during tendering and construction planning or reinforce an operational site at short notice.
01
Which work stage is behind programme, and when must the area be ready?
02
We agree the right skills, team size and working hours for the task.
03
The team is deployed to the critical work stage.
Conditions change quickly on data centre sites. Designs develop, approvals are delayed, material deliveries alter the sequence and individual work stages can fall behind programme.
Additional labour alone does not always solve the problem. Sites need people who can move between tasks and understand the safety, quality, documentation and programme requirements of major construction projects.
NL Trade’s multi-skilled construction teams work as required on concrete, reinforcement, steel installation, facades, roofing, partitions, ceilings and walkways, as well as final finishing and remedial works.
A team that already knows the site’s procedures, logistics, safety requirements and documentation can move quickly to a new task without mobilising an entirely new subcontractor.
We can assemble a team for a defined work stage or deploy it flexibly across several building tasks as the project progresses.
The building works for a data centre extend from foundations to the building envelope, technical structures, interior construction and finishing.
NL Trade delivers these stages as separate contracts or broader work packages. Our range of skills allows main contractors to use the same partner across project stages and move resources quickly to where they are needed.
Foundations and concrete structures support the entire data centre building and its heavy technical infrastructure.
Concrete works include pad and strip foundations, foundation walls, piers, ground floor slabs, service trenches, equipment bases, upstands, technical room structures and other in-situ concrete specified in the project design.
NL Trade carries out foundation and concrete work stages and supplies skilled teams for urgent concrete construction tasks.
Our concrete experience includes reinforcement, floor pours, beam strengthening, new beams and columns, retaining walls, ramps, stairs and ground floor structures.

Structural steel forms part of the building frame, technical platforms, access routes, maintenance structures and equipment supports.
Installation requires dimensional accuracy, safe lifting, control of the work sequence and coordination with other construction and MEP installations.
NL Trade installs steel structures as part of data centre building contracts and provides experienced installers for urgent steelwork stages.
The scope can include steel structures, technical platforms, steel stairs, ladders, balustrades, equipment supports and other secondary steelwork shown in the project design.
The building envelope protects critical technical systems from Finnish weather conditions while providing the required moisture performance, airtightness, energy efficiency, fire safety and acoustic performance.
Facade solutions include sandwich panels, profiled metal sheeting, metal cassettes, concrete structures and other systems specified by the design.
The package also involves flashings, junctions, technical openings, smoke ventilation structures, ventilation louvres and security-rated structures.
Acoustic louvres can be used around cooling and ventilation equipment to provide the required airflow while controlling noise emissions outside the building.
NL Trade installs facade insulation, framing, cladding, flashings and associated building envelope works.

A data centre roof is a technically demanding assembly. It accommodates large cooling units, pipework, ductwork, maintenance platforms, safety systems and numerous service penetrations.
Reliable roofing involves more than the waterproofing membrane. Equipment supports, penetrations, junctions, roof drains, maintenance routes, safety structures and later technical modifications all affect roof performance.
Roofing works include bituminous membrane waterproofing, roof carpentry, sheet metal works, standing seam metal roofing, roof drains, fire protection details, roof safety products and smoke vents.
NL Trade delivers roofing from the agreed plans through to handover and coordinates its works with the extensive technical equipment on the roof.

Partitions separate data halls, electrical rooms, cooling systems, technical spaces and fire compartments.
Depending on the project, structures require fire resistance, mechanical strength, airtightness, sound insulation and carefully executed service penetrations.
Systems include plasterboard partitions, sandwich structures, metal–mineral wool–metal panels and other compartmentation systems suited to the intended use.
Fire compartment walls may include EI60 and EI90 constructions and impact-resistant EI-M solutions where required by the project.
NL Trade delivers partitions, fire compartmentation and associated building works for data centres.
A technical ceiling is part of the support, coordination and maintenance strategy for building services, as well as the visible ceiling finish.
NL Trade installs load-bearing ceiling systems incorporating interfaces for electrical, ICT, lighting, cooling and other technical systems in accordance with the project design.
The ceiling finish can be metal panels or sound-absorbing Rockfon acoustic tiles, depending on the application. Maintenance zones, walkways and documented quality assurance can form part of the agreed package.
We have installed approximately 9,800 m² of load-bearing ceiling system in data centre projects.
Read more about load-bearing ceiling systems, loading, maintenance access, Rockfon acoustic tiles and the programme implications of efficient installation.
MEP stands for Mechanical, Electrical and Plumbing. Technical systems are inspected, maintained and modified throughout the data centre’s service life.
Walkways, maintenance platforms, grated floors, stairs, ladders, balustrades and gates are important for safe access to technical systems.
NL Trade installs:
Balustrade heights, gates and fall protection on MEP platforms and technical maintenance areas are designed for the intended use. Removable or opening sections can be provided where required for safe lifting and maintenance of large equipment.
During fit-out, the building interior is prepared for installation and commissioning of technical systems.
Fit-out works include partitions, fire compartmentation, technical ceilings, floor and wall finishes, doors, joint sealing, trims, protective structures and other associated building works.
Programme control is especially important during fit-out because electrical, ICT, automation, cooling and other specialist contractors work in the same areas.
NL Trade’s multi-skilled teams suit this stage because the same people can undertake several building tasks without repeatedly changing crews.

Doors form part of the building’s fire protection, access control and security solution.
External and technical room doors may include burglary-resistant doors, fire doors, technical steel doors, roller shutters and other specialist doors according to project requirements.
Security specifications may include EN 1627 RC2- and RC3-rated solutions. Locking, electromechanical locks, cabling and access control are coordinated with the rest of the building’s security systems.
NL Trade installs doors and associated building works as part of a wider fit-out package.
Technical room floors may require dust-free surfaces, wear and chemical resistance, watertightness and a finish suited to the intended use.
Floor works include concrete surface finishing, resin coatings, waterproofing, elastic joint sealing, movement joints and other floor finishes.
Towards completion, NL Trade also undertakes finishing, remedial, snagging, punch list and defect rectification works before final area handover.
Building works are coordinated with extensive MEP installations. Construction detailing includes system-specific shop drawings, details, fixings, openings and the necessary 3D modelling.
NL Trade participates in construction detailing and 3D coordination together with the project’s designers.
Modelled elements can include ceiling systems, facades, louvres, walkways, technical platforms and other building structures.
Where required, agreed project changes are incorporated into Revit/IFC information, with the agreed as-built documentation prepared for handover.
A fast construction programme must not compromise quality.
Building work stages must be inspected and documented before subsequent contractors conceal the structures with their installations.
Area-specific quality assurance is therefore part of normal production progress.
NL Trade adapts inspection, measurement, photographic recording and handover procedures to project requirements and the client’s documentation system.
The aim is to hand over a completed area to the next trade without later opening-up, remedial works or uncertainty.
We have experience of projects where our work package required RAMS documentation, an Inspection and Test Plan (ITP) and a project-specific quality plan.
We prepare and coordinate documentation for our scope in line with project requirements and the main contractor’s approval procedures. Agreed measurement records, inspection reports and photographs are compiled in the client’s document management system. Photography follows the site’s confidentiality and security rules.
NL Trade provides building fabric maintenance, upkeep and repair works after handover. The scope, planned visits and working hours are agreed around the facility’s operational and security requirements.
In an operational data centre, work is phased with the client. Work area segregation, dust control, protection, access permissions and any required permits are agreed before work starts.
Changes to the loads, hangers or fixings of a load-bearing ceiling system follow approved designs. Ceiling tiles are not walking surfaces; maintenance uses purpose-designed access routes and equipment.
NL Trade Oy has delivered a range of demanding building work stages on data centre projects.
Our data centre experience includes:
Alongside data centres, NL Trade has extensive experience in major hospital, hotel, school, commercial and other programme-critical construction projects.
9,800 m² of load-bearing ceiling system installed
Steel installation, reinforcement, walkways, technical ceilings, finishing, alterations and snagging.
68,000 m² of ceiling installations
23,000 m² of partition works plus other works
92 installers at peak
Ceilings: approximately 10,500 m²
Partitions: approximately 5,000 m²
Kalajärvi School: approximately 5,615 m²
Kontula Primary School: approximately 4,671 m² of bituminous roofing, carpentry and sheet metal works
Taivallahti Comprehensive School: approximately 4,000 m² of bituminous roofing, standing seam metal roofing and sheet metal works
Kontulankaari 11, Helsinki: approximately 2,275 m²
Silkkitie: approximately 5,650 m², floor reinforcement and concrete pours, beam strengthening and new beam and column pours
Zacharias Topeliusskolan: approximately 888 m² of floor reinforcement and concrete pours, plus in-situ retaining walls, ramps, stairs and ground floor structures
Seminaari campus: 1,200 m² of facade insulation, framing and cladding installation
Successful delivery depends on more than the number of installers. Site management requires experienced chargehands and supervisors who can manage personnel, work areas, material logistics, safety, quality and programme together.
NL Trade has managed sites with dozens of its own installers working simultaneously. At peak, a single site has had 92 NL Trade installers.
We have helped main contractors recover programmes on several major projects and complete work stages in time for the agreed handover.
This expertise is especially valuable in data centres, where construction progresses across several areas at once and completed areas are continuously handed over to following trades.
Construction companies use NL Trade for both planned contracts and building tasks that arise at short notice.
Our multi-skilled teams can move between foundations, reinforcement, steelwork, facades, roofing, partitions, ceilings, walkways and final snagging as the project requires.
This flexibility is particularly useful when a data centre work stage falls behind programme. The same experienced workforce partner can take responsibility for different urgent building tasks and help return the project to programme.
If a work stage is preventing the next contractor from progressing, contact us as early as possible.
Tell us:
We assess the situation and assemble a team to help recover the delay as quickly as possible.
We can start reviewing a wider building works package even if the design is still developing.
NL TRADE OY · BUILDING WORKS AND SITE WORKFORCE
Send us your scope of works, IFC or PDF drawings and target programme. We will assess which building work stages we can take on and the resources your project needs.